11 of 11 projects
Machine Welding OutfallWater, Storm & Sewer

Machine Welding Outfall

ClientWithheldLocationDunn, NCScope6,280 ft of 36" fiberglass-reinforced pipe gravity sewer
Old Apex RoadWater, Storm & Sewer

Old Apex Road

ClientTown of CaryLocationCary, NCScope8,448 ft of 24" ductile iron water main
American Tobacco Waterline ReplacementWater, Storm & Sewer

American Tobacco Waterline Replacement

ClientCity of DurhamLocationDurham, NCScope14,995 ft of 12"–36" ductile iron water main · 2,870 ft of 12"–16" ductile iron gravity sewer
Adams Glenn SubdivisionWater, Storm & Sewer

Adams Glenn Subdivision

ClientDR HortonLocationGreenville, SCScope273-lot, 108-acre development · 12,000 ft of storm drain · 9,000 ft of water main · 9,400 ft of gravity sewer · lift station and force main · 354,000 cy of dirt moved · 64,000 cy of rock blasted and crushed
Bobby Setzer Fish HatcheryWater, Storm & Sewer

Bobby Setzer Fish Hatchery

ClientState of North CarolinaLocationPisgah Forest, NCScopeHatchery rebuild · 6"–30" ductile iron drain and water lines · 12"–24" storm · effluent pump station · river head works · pad and raceway grading
Settings of Black Mountain - Helene RecoveryEmergency Response

Settings of Black Mountain - Helene Recovery

ClientHOA for the Settings of Black MountainLocationBlack Mountain, NCScopePost-Helene restoration · 6 arch culvert and footing repairs · 2 arch culvert replacements · slope and stream stabilization · street and sidewalk replacement
Tyger Pines SubdivisionEarthwork & Grading

Tyger Pines Subdivision

ClientLyon JayLocationMoore, SCScope255-lot subdivision · 57 ac clearing · 261,000 cy grading · 8,653 ft of 15"–36" RCP storm · 7,010 ft of 6" PVC water · 8,000 ft of 8" gravity sewer
Weaverville Pump Station ImprovementsWater, Storm & Sewer

Weaverville Pump Station Improvements

ClientMetropolitan Sewerage DistrictLocationWeaverville, NCScope16,200 ft of 24" HDPE force main · 1,850 ft of 6" HDPE force main · 575 ft of 30" DIP gravity sewer · new manholes, ARVs, bypass pumping and tie-ins
12" Surge Valve ReplacementEmergency Response

12" Surge Valve Replacement

ClientCity of DurhamLocationDurham, NCScope12" surge valve and gate valve replacement · new 5×5 access hatch on existing precast structure
30" Forcemain RepairEmergency Response

30" Forcemain Repair

ClientCity of DurhamLocationDurham, NCScope2× 30" line stops · 360 ft of 30" forcemain replacement
NCDOT Hurricane Helene ResponseEmergency Response

NCDOT Hurricane Helene Response

ClientNCDOTLocationAppalachian Mountains, NCScopePost-Helene restoration · 2.5 miles of roadway rebuild in an isolated area with limited resident access · slope stabilization and armoring · storm drainage reestablishment · new road subgrade prep